خلاصہ

The Defective Premises Act 1972 imposes a statutory duty on persons taking on work in connection with the provision of a dwelling (including builders, developers, architects, and sub-contractors) to ensure that the work is done in a professional manner with proper materials so that the dwelling will be fit for habitation when completed. It provides a cause of action for owners and subsequent purchasers.

اہم نکات

  • Duty to build dwellings properly — work must be done in a workmanlike or professional manner with proper materials (s.1)
  • Duty owed to the person ordering the work and every person who acquires an interest in the dwelling (s.1(1))
  • Cannot be excluded by contract (s.6(3))
  • Landlord's duty of care in respect of defects arising from failure to maintain or repair (s.4)
  • Limitation period extended to 15/30 years by Building Safety Act 2022 (s.135 BSA)
  • Duty to build dwellings properly — applies to builders, developers, architects, surveyors and sub-contractors (s.1)
  • The duty is owed to the person who ordered the work and to subsequent purchasers (s.1(1))
  • Work must be done in a workmanlike/professional manner with proper materials so the dwelling is fit for habitation (s.1(1))
  • Landlord's duty of care regarding defects in the state of premises let (s.4)
  • The limitation period was extended from 6 to 15 years by the Building Safety Act 2022 (retrospectively for existing buildings)
  • Cannot be excluded or restricted by contract (s.6(3))

حصے اور دفعات

ترامیم کی تاریخ

2022Building Safety Act 2022

Extended limitation period from 6 years to 15 years prospectively and 30 years retrospectively for claims relating to higher-risk buildings.

2022Building Safety Act 2022

Extended the limitation period for claims under s.1 from 6 years to 15 years, with retrospective effect for existing buildings.