The Helios Renewable Energy Project Order 2025
The Helios Renewable Energy Project Order 2025
Independent editorial summary — not the official statute text. Read the official version on legislation.gov.uk.
Type: UK Statutory Instrument
Year: 2025
Number: 1372
Made: 2025-12-03
Coming into force: 2025-12-29
Last ingested: 2026-06-12 from legislation.gov.uk.
Explanatory note
Reproduced verbatim from the instrument as published on legislation.gov.uk (Crown Copyright, Open Government Licence v3.0). The note is prepared by the responsible government department and is not part of the instrument itself.
This Order grants development consent for, and authorises the construction, operation and maintenance of a solar generating station and battery energy storage facility on land within the Order limits together with associated development. This Order imposes requirements in connection with the development and authorises the compulsory acquisition of rights in land and the right to use land and to override easements and other rights.
A copy of the plans and book of reference referred to in this Order and certified in accordance with article 36 (certification of plans and documents, etc.) may be inspected free of charge during working hours at the undertaker’s registered office at 17 th Floor Hylo 103-105 Bunhill Row, London, United Kingdom, EC1Y 8LZ as may be updated from time to time.
Other UKSIs from 2025
- The Air Navigation (Restriction of Flying) (Mountain Ash) (Emergency) Regulations 2025 — UKSI 2025/1373
- The Air Navigation (Restriction of Flying) (Prescott, Merseyside) (Emergency) Regulations 2025 — UKSI 2025/1374
- The Levelling-up and Regeneration Act 2023 (Commencement No. 9) and Planning and Infrastructure Act 2025 (Commencement No. 1 and Transitional Provisions) Regulations 2025 — UKSI 2025/1370