Skip to main content

Disclaimer: This is not legal advice. Legislation and case law change. Always consult a qualified solicitor for your specific situation.

UK Law Reference
All Statutory Instruments
UK Statutory Instrument
UKSI 2026/1057
UK-wide
final

The M25 Junction 10/A3 Wisley Interchange Development Consent (Amendment) Order 2026

The M25 Junction 10/A3 Wisley Interchange Development Consent (Amendment) Order 2026

Independent editorial summary — not the official statute text. Read the official version on legislation.gov.uk.

Type: UK Statutory Instrument

Year: 2026

Number: 1057

Made: 2026-07-16

Coming into force: 2026-07-17

Last ingested: 2026-10-12 from legislation.gov.uk.

Read the full text on legislation.gov.uk

Explanatory note

Reproduced verbatim from the instrument as published on legislation.gov.uk (Crown Copyright, Open Government Licence v3.0). The note is prepared by the responsible government department and is not part of the instrument itself.

This Order amends the M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (“ the 2022 Order ”), a development consent order under the Planning Act 2008 (“ the Act ”).

This Order follows an application under paragraph 2 of Schedule 6 to the Act to make non-material changes to the 2022 Order.

The table in Part 5 of Schedule 3 is amended to remove entries prescribing certain speed limits, and to remove reference to a road to which works are no longer proposed to be carried out. Speed limits for the M25 carriageway, the two free-flow slip lanes for traffic entering the M25 and the M25 on-slip roads are prescribed under the M25 Motorway (Junctions 7 to 16) (Variable Speed Limits) Regulations 2012 ( S.I. 2012/2134 ).

The entry in the table in Schedule 11 relating to the Speed Limits and Traffic Regulations Plans amends the document reference and revision number.

Legislation guides on this site

Other UKSIs from 2026