The M25 Junction 10/A3 Wisley Interchange Development Consent (Amendment) Order 2026
The M25 Junction 10/A3 Wisley Interchange Development Consent (Amendment) Order 2026
Independent editorial summary — not the official statute text. Read the official version on legislation.gov.uk.
Type: UK Statutory Instrument
Year: 2026
Number: 1057
Made: 2026-07-16
Coming into force: 2026-07-17
Last ingested: 2026-10-12 from legislation.gov.uk.
Explanatory note
Reproduced verbatim from the instrument as published on legislation.gov.uk (Crown Copyright, Open Government Licence v3.0). The note is prepared by the responsible government department and is not part of the instrument itself.
This Order amends the M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (“ the 2022 Order ”), a development consent order under the Planning Act 2008 (“ the Act ”).
This Order follows an application under paragraph 2 of Schedule 6 to the Act to make non-material changes to the 2022 Order.
The table in Part 5 of Schedule 3 is amended to remove entries prescribing certain speed limits, and to remove reference to a road to which works are no longer proposed to be carried out. Speed limits for the M25 carriageway, the two free-flow slip lanes for traffic entering the M25 and the M25 on-slip roads are prescribed under the M25 Motorway (Junctions 7 to 16) (Variable Speed Limits) Regulations 2012 ( S.I. 2012/2134 ).
The entry in the table in Schedule 11 relating to the Speed Limits and Traffic Regulations Plans amends the document reference and revision number.
Legislation guides on this site
- Planning Act 2008 — our full guide
Other UKSIs from 2026
- The Town and Country Planning (General Permitted Development) (England) (Amendment) (No. 2) Order 2026 — UKSI 2026/1056
- The Air Navigation (Restriction of Flying) (Windsor) Regulations 2026 — UKSI 2026/1059
- The Gatwick Airport (Northern Runway Project) Development Consent (Correction) Order 2026 — UKSI 2026/1055