The Building (Higher-Risk Buildings Procedures) (Wales) Regulations 2025 / Rheoliadau Adeiladu (Gweithdrefnau Adeiladau Risg Uwch) (Cymru) 2025
The Building (Higher-Risk Buildings Procedures) (Wales) Regulations 2025
Independent editorial summary — not the official statute text. Read the official version on legislation.gov.uk.
Type: Welsh Statutory Instrument
Year: 2025
Number: 1321
Made: 2025-12-12
Coming into force: 2026-07-01
Last ingested: 2026-06-12 from legislation.gov.uk.
Explanatory note
Reproduced verbatim from the instrument as published on legislation.gov.uk (Crown Copyright, Open Government Licence v3.0). The note is prepared by the responsible government department and is not part of the instrument itself.
This instrument is part of a number of Regulations which implement the Building Safety Act 2022 in respect of higher-risk buildings in Wales.
Under section 121A of the Building Act 1984 (“ the 1984 Act ”), the building control authority is generally the local authority for the area in which the building or proposed building concerned is situated. However, where a local authority proposes to carry out higher-risk building work (as defined in section 120I of the 1984 Act), regulations can be made under section 91ZD of the 1984 Act designating another local authority as building control authority for that work. Regulations under section 91ZD are to be made elsewhere.
The requirements in the Building Regulations 2010 currently apply to higher-risk buildings. Amendments (to be made elsewhere) to those Regulations disapply most of the procedural requirements in them in relation to higher-risk buildings (as to the definition of which see the Building Safety (Description of Higher-Risk Building) (Design and Construction Phase) (Wales) Regulations 2023). Consequently, procedures contained in these Regulations will apply in relation to higher-risk buildings instead of those in the Building Regulations 2010.
Part 2 of these Regulations sets out the procedures for applying for building control approval in relation to higher-risk buildings. Applications must be submitted to the building control authority giving the information required and be accompanied by the plans, documents and information required. Building control approval may, with the applicant’s consent, be subject to a requirement, for example, to not progress beyond a specific point without agreement of the building control authority or that more detailed plans or documents could be approved by the building control authority at a later date.
Part 3 of these Regulations sets out the change control process where any document relating to the work which was approved by the building control authority at the application stage (or subsequently under a requirement or a controlled change) is to be changed. Provision is also made in this Part for change to the client, principal contractor or principal designer, insolvency etc. of a client and variation of a requirement imposed on a building control approval.
Part 4 of these Regulations sets out provisions in relation to the golden thread information, mandatory occurrence reporting and the handover of information on completion of the work.
Part 5 of these Regulations sets out the procedures for applying for completion certificates and partial completion certificates in relation to higher-risk buildings. Applications must be submitted to the building control authority giving the information required and accompanied by the plans and documents required.
Part 6 of these Regulations sets out provision relating to inspections, testing and sampling, regularisation of unauthorised work and the procedure under section 30A of the 1984 Act (which provides that a request can be made to the Welsh Ministers for determination of an application where the building control authority has not made a decision within the time limit prescribed).
Part 7 of these Regulations defines exempt work, gives the building control authority the power by direction to require an application via a specified method, and also sets out those provisions in relation to which a stop notice under section 35C of the 1984 Act may be given. Part 7 also includes consequential amendments to the Regulatory Reform (Fire Safety) Order 2005 and the Community Infrastructure Levy Regulations 2010.
Schedule 3 to these Regulations sets out transitional provisions.
The Welsh Ministers’ Code of Practice on the carrying out of Regulatory Impact Assessments was considered in relation to these Regulations. As a result, a regulatory impact assessment has been prepared as to the likely costs and benefits of complying with these Regulations. A copy can be obtained from Welsh Government, Cathays Park, Cardiff, CF10 3NQ and is published on www.gov.wales .
Legislation guides on this site
- Building Safety Act 2022 — our full guide
- Building Act 1984 — our full guide
Other WSIs from 2025
- The Building etc. (Amendment) (No. 2) (Wales) Regulations 2025 / Rheoliadau Adeiladu etc. (Diwygio) (Rhif 2) (Cymru) 2025 — WSI 2025/1320
- The Council Tax (Alteration of Lists and Appeals) (Amendment) (Wales) Regulations 2025 / Rheoliadau’r Dreth Gyngor (Newid Rhestrau ac Apelau) (Diwygio) (Cymru) 2025 — WSI 2025/1323
- The Revised Code of Practice on the exercise of social services functions in relation to Part 4 (direct payments and choice of accommodation) and Part 5 (charging and financial assessment) of the Social Services and Well-being (Wales) Act 2014 (Appointed Day) Order 2025 / Gorchymyn y Cod Ymarfer Diwygiedig ar arfer swyddogaethau gwasanaethau cymdeithasol mewn perthynas â Rhan 4 (taliadau uniongyrchol a dewis o lety) a Rhan 5 (codi ffioedd ac asesiadau ariannol) o Ddeddf Gwasanaethau Cymdeithasol a Llesiant (Cymru) 2014 (Diwrnod Penodedig) 2025 — WSI 2025/1317